Power Plants on the Sava River

Mavčiče Hydroelectric Power Plant

62 GWh/year

Medvode Hydroelectric Power Plant

72 GWh/year

Vrhovo Hydroelectric Power Plant

184,8 MWh/year

Small Hydroelectric Plant (SHP) Mavčiče

Average annual production: 340 MWh

Small Hydroelectric Plant (SHP) Hrušica

Average annual production: 1.78 GWh

Small Hydroelectric Plant (SHP) Borovlje

Average annual production: 2.1 GWh

Small Hydroelectric Plant (SHP) Mavčiče

Average annual production: 2.12 GWh

Small Hydroelectric Plant (SHP) Bistrica

Average annual production: 7.5 GWh

Vrhovo Hydroelectric Power Plant

120 GWh/year

Moste Hydroelectric Power Plant

65 GWh/year

Small Solar Power Plant (MFE) Mavčiče

72 MWh/year

Small Solar Power Plant (MFE) Medvode 1 in Medvode 2

86 MWh/year

Small Solar Power Plant (MFE) Vrhovo 1 in Vrhovo 2

74.6 MWh/year and 404 MWh/year

Završnica Hydroelectric Power Plant

More about the plant

Start of operation: 1986
Renovations and upgrades: 2011
Type of power plant: Run-of-the-river power plant with a dam structure

Read more

HPP Mavčiče is located in the valley of the Sava River downstream from Kranj, near the village of Mavčiče. The power plant is of the run-of-river type with a concrete-gravity dam structure. The accumulation reservoir allows for daily water storage to cover peak electricity consumption. Once the entire chain of Sava River hydroelectric power plants is completed, the reservoir will assume the role of the headwater reservoir.

62 GWh
Annual production

38 MW
Power at the threshold

2
Number of units

2 x 25 MVA
Installed capacity

Start of Operation: 1987
Upgrades and Enhancements: /
Type of Power Plant: A small hydroelectric power plant with an asynchronous type motor

Read more

Small HPP Mavčiče is located on the southern side of the Sava river in the inflow of water to the fish spawning ground. In the small power plant, one aggregate is installed, which operates in parallel with the network, where it emits all the favorable energy according to the prescribed constant water inflow of 0.5 m3/s.

340 MWh
Annual production

66 kW
Power at generator terminals

1
Number of units

90 kW
Installed capacity

Start of operation: 2008, 2010
Renovations and upgrades: /
Type of power plant: Small hydroelectric plant with asynchronous squirrel-cage motor

Read more

Small HPP Vrhovo is located on the southern side of the Sava River, where water flows into a fish spawning ground.

A single unit operates in the small power plant, operating in parallel with the grid, delivering all available energy based on the prescribed constant water flow of 0.5 m3/s.

184,4 MWh
Annual production

22 kW
Power at generator terminals

1
Number of units

30 kW
Installed capacity

Start of operation: 2008, 2010
Upgrades and enhancements: /
Type of Power Plant: Small Solar Power Plant (MFE)

Read more

MFE Vrhovo consists of 360 PV modules with a capacity of 215 W, which are installed on the roof of the machine room of HPP Vrhovo. MFE Vrhovo 2 consists of 1584 PV modules with a capacity of 224 W, which are installed on the right-bank of the reservoir of HPP Vrhovo. At the time of comissioning, this was the largest solar power plant in Slovenia.

More about the Operation of Vrhovo 1
More about the Operation of Vrhovo 2

MFE Vrhovo 1

75 MWh
Annual production

360
Number of modules

215 Wp
Power of individual module

MFE Vrhovo 2

404 MWh
Annual production

1584
Number of modules

224 Wp
Power of individual module

Start of operation: 2008
Upgrades and enhancements: /
Type of Power Plant: Small Solar Power Plant (MFE)

Read more

MFE Medvode 1 consists of 280 PV modules with a capacity of 210 W, which are installed on the roof of the maintenance center of HPP Medvode.

MFE Medvode 2 consists of 105 PV modules with a capacity of 245 W, which are installed on the roofs of the switchgear building and the bowling alley of Hydro near HPP Medvode.

More about the Operation

MFE Medvode 1

60 MWh
Annual production

280
Number of modules

210 Wp
Power of individual module

MFE Medvode 2

26 MWh
Annual production

105
Number of modules

245 Wp
Power of individual module

Start of Operation: 2006
Upgrades and Enhancements: 2007
Type of Power Plant: Small Solar Power Plant (MFE)

Read more

MFE Mavčiče consists of a total of 420 PV modules with a capacity of 170 Wp, which are installed on the southern facade and roof of the HPP Mavčiče building.

More about the Operation

72 MWh
Annual Production

2×210
Number of modules

170 Wp
Power of individual module

Start of operation: 1952, 1977
Renovations and upgrades: 1964, 1977, 1999, 2008-2010
Type of power plant: Accumulation power plant for peak energy production

Read more

HPP Moste has been operating as the first power plant on the Sava River since 1952. The dam is concrete, arch-gravity type, and is located in the narrowest part of the Sava Canyon, in the Kavčke gorge below Žirovnica, making it the highest dam in Slovenia at a height of 60 meters. The accumulation reservoir allows for weekly flow regulation.

Moste Hydroelectric Power Plant

60 GWh
Annual production

2×9 MVA
Installed capacity

2
Number of units

13 MW
Power at the threshold

Završnica Hydroelectric Power Plant

5 GWh
Annual production

11 MVA
Installed capacity

1
Number of units

8 MW
Power at the threshold

Start of operation: 1953
Renovations and upgrades: 1964, 1994 – 1995, 2003 – 2004
Type of power plant: Hydroelectric Power Plant

Read more

The power plant is part of a chain of hydroelectric power plants on the Sava River and also houses the control center for all the hydroelectric power plants on the Sava River, as well as the maintenance center for the chain of hydroelectric power plants in the upper and middle Sava region. The HPP Medvode power plant is located above the confluence of the Sava and Sora rivers, near the town of Medvode. Due to the damming of the river, Zbilje Lake has formed at this location.

72 GWh
Annual production

2 x 13,5 MVA 
Installed capacity


Number of units

25 MW 
Power at the threshold

Start of operation: 1993
Renovations and upgrades: /
Type of power plant: Hydroelectric Power Plant

Read more

The Vrhovo hydroelectric power plant is situated in a field below the settlement of Vrhovo and is the first in the series of hydroelectric power plants in the Lower Sava Cascade. The dam structure is of the concrete gravity type, with a structural height of 27 meters. The power plant operates in a daily flow regime with reservoir storage, serving as the headwater reservoir for the Lower Sava Cascade. After the completion of the entire chain of hydroelectric power plants on the Sava River, the reservoir will have the role of an intermediate regulating reservoir.

120 GWh 
Annual production

34 MW 
Power at the threshold


Number of units

3 x 14,3 MW 
Installed capacity

Start of operation: 1995
Type of power plant: Hydroelectric Power Plant

Small hydroelectric power plant started operation in 1995 and has been owned by SEL since 2018.

1,78 GWh
Average annual production

347 kW
Installed capacity

Start of operation: 2018
Type of power plant: Hydroelectric Power Plant

Small hydroelectric power plant started operation in 2018.

2,1 GWh
Average annual production

44 kW
Installed capacity

Start of operation: 2017
Type of power plant: Hydroelectric Power Plant

Small hydroelectric power plant started operation in 2017.

2,12 GWh
Average annual production

320 kW
Installed capacity

Start of operation: 1999
Type of power plant: Hydroelectric Power Plant

Small hydroelectric power plant started operation in 1999 and has been owned by SEL since 2021.

7,5 GWh
Average annual production

2,5 MW
Installed capacity