Home » Production Facilities

Power Plants on the Sava River

Zemljevid reke Save s hidroelektrarnami in sončnimi elektrarnami
Mavčiče Hydroelectric Power Plant

Mavčiče Hydroelectric Power Plant

Start of operation: 1987
Upgrades and renovations: 2011
Type of plant: Run-of-the-river plant with dam structure

Preberite več

HPP Mavčiče lies in the valley of the Sava River downstream of Kranj, near the village of Mavčiče. It is a run-of-the-river plant with a concrete gravity dam structure. The reservoir enables daily water accumulation to cover peak demand for electricity. Once the full chain of HPPs on the Sava is built, the reservoir will take on the role of a head pond.

79 GWh
annual production

2 x 13.5 MVA
installed capacity

2
number of units

25 MW
rated power

Medvode Hydroelectric Power Plant

Medvode Hydroelectric Power Plant

Start of operation: 1953
Upgrades and renovations: 1964, 1994 – 1995, 2003 – 2004
Type of plant: Hydroelectric power plant

Preberite več

The plant is part of the chain of hydroelectric power plants on the Sava River and houses the control centre for all hydroelectric power plants on the Sava, as well as the maintenance centre for the upper and middle Sava chain. HPP Medvode is located above the confluence of the Sava and Sora rivers, near the village of Medvode. The rise in the water level formed Zbilje Lake at this location.

79 GWh
annual production

2 x 13.5 MVA
installed capacity

2
number of units

25 MW
rated power

Vrhovo Hydroelectric Power Plant

Vrhovo Hydroelectric Power Plant

Start of operation: 1993
Upgrades and renovations: /
Type of plant: Hydroelectric power plant

Preberite več

HPP Vrhovo lies on the plain below the village of Vrhovo and is the first in the chain of hydroelectric power plants on the lower Sava. The dam structure is of the concrete gravity type, with a structural height of 27 m. The plant operates in a daily run-of-the-river regime with a reservoir that serves as the head pond for the lower Sava chain. Once the full chain of HPPs on the Sava is completed, the reservoir will take on the role of an intermediate equalising basin.

118 GWh
annual production

3 x 14.3 MVA
installed capacity

3
number of units

34 MW
rated power

Moste Hydroelectric Power Plant

Moste Hydroelectric Power Plant

Start of operation: 1952, 1977
Upgrades and renovations: 1964, 1977, 1999, 2008-2010
Type of plant: Storage plant for peak energy production

Preberite več

HPP Moste has operated as the first power plant on the Sava River since 1952. The dam is a concrete arch-gravity structure located in the narrowest part of the Sava canyon, in the Kavčke gorge below Žirovnica. At 60 m, it is also the highest dam in Slovenia. The reservoir enables weekly equalisation of flows.

60 GWh, 5 GWh
annual production

2x9 MVA, 11 MVA
installed capacity

3
number of units

38 MW, 8 MW
rated power

Small Hydroelectric Power Plant (sHPP) Vrhovo

Small Hydroelectric Power Plant (sHPP) Vrhovo

Start of operation: 2008
Upgrades and renovations: /
Type of plant: Small hydroelectric plant with an asynchronous standard motor

Preberite več

sHPP Vrhovo lies on the southern side of the Sava River, in the water inflow to the fish spawning ground. A single unit is installed in the small plant, operating in parallel with the grid, to which it delivers all available energy based on the prescribed constant water inflow of 0.5 m3/s.

120 MWh
annual production

15 kW
generator terminal power

1
number of units

Small Hydroelectric Power Plant (sHPP) Mavčiče

Small Hydroelectric Power Plant (sHPP) Mavčiče

Start of operation: 1987
Upgrades and renovations: /
Type of plant: Small hydroelectric plant with an asynchronous standard motor

Preberite več

sHPP Mavčiče lies on the southern side of the Sava River, in the water inflow to the fish spawning ground. A single unit is installed in the small plant, operating in parallel with the grid, to which it delivers all available energy based on the prescribed constant water inflow of 0.5 m3/s.

420 MWh
annual production

50 kW
generator terminal power

1
number of units

Small Hydroelectric Power Plant (sHPP) Hrušica

Small Hydroelectric Power Plant (sHPP) Hrušica

Start of operation: 1995
Type of plant: Hydroelectric power plant

The small hydroelectric power plant began operating in 1995 and has been owned by SEL since 2018.

1.78 GWh
average annual production

354 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Borovlje

Small Hydroelectric Power Plant (sHPP) Borovlje

Start of operation: 2018
Type of plant: Hydroelectric power plant

Preberite več

The small hydroelectric power plant began operating in 2018.

2.1 GWh
average annual production

440 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Goričane

Small Hydroelectric Power Plant (sHPP) Goričane

Start of operation: 2017
Type of plant: Hydroelectric power plant

The small hydroelectric power plant began operating in 2017.

2.12 GWh
average annual production

320 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Bistrica

Small Hydroelectric Power Plant (sHPP) Bistrica

Start of operation: 1999
Type of plant: Hydroelectric power plant

The small hydroelectric power plant began operating in 1999 and has been owned by SEL since 2021.

7.5 GWh
average annual production

2.5 MW
installed capacity

Small Solar Power Plant (SPP) Mavčiče

Small Solar Power Plant (SPP) Mavčiče

Start of operation: 2006
Upgrades and renovations: 2007
Type of plant: small solar power plant (SPP)

Preberite več

SPP Mavčiče consists of 420 PV modules of 170 Wp each, installed on the southern facade and roof of the HPP Mavčiče building.

73 MWh
annual production

2x210
number of modules

170 Wp
power per module

Small Solar Power Plant (SPP) Medvode 1 and Medvode 2

Small Solar Power Plant (SPP) Medvode 1 and Medvode 2

Start of operation: 2008, 2012
Upgrades and renovations: /
Type of plant: small solar power plant (SPP)

Preberite več

SPP Medvode consists of 280 PV modules of 210 W each, installed on the roof of the maintenance centre of HPP Medvode.

60 MWh
annual production

280
number of modules

210 Wp
power per module

Small Solar Power Plant (SPP) Vrhovo 1 and Vrhovo 2

Small Solar Power Plant (SPP) Vrhovo 1 and Vrhovo 2

Start of operation: 2007, 2011
Upgrades and renovations: /
Type of plant: small solar power plant (SPP)

Preberite več

SPP Vrhovo comprises 360 PV modules of 215 W each, installed on the roof of the HPP Vrhovo powerhouse. SPP Vrhovo 2 comprises 1584 PV modules of 224 W each, installed on the right-bank embankment of the HPP Vrhovo reservoir. At the time of opening, it was the largest solar power plant in Slovenia.

74.6 MWh, 404 MWh
annual production

360, 1584
number of modules

215 Wp, 224 Wp
power per module

Small Hydroelectric Power Plant (sHPP) Cerklje

Small Hydroelectric Power Plant (sHPP) Cerklje

Start of operation: 1924
Reconstruction: 1998
Type of plant: Hydroelectric power plant

Preberite več

A small run-of-river derivation power plant on the Reka stream with a relatively small installed flow of 0.25 m³/s. Despite its modest output, it harnesses a substantial net head of 64 m.

100 MWh/year
average annual production

80 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Rudno

Small Hydroelectric Power Plant (sHPP) Rudno

Start of operation: 1931
Reconstruction: 2020
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant above the village of Rudno, harnessing the Češnjica (also Rudnica) stream. It exploits a relatively high gross head of 52.2 m.

591 MWh/year
average annual production

190 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Lomščica

Small Hydroelectric Power Plant (sHPP) Lomščica

Start of operation: 1991
Type of plant: Hydroelectric power plant

Preberite več

A storage-derivation power plant above the village of Lom near Tržič, harnessing the Lomščica stream. A key feature is the storage reservoir with a useful volume of 62,300 m³.

6,290 MWh/year
average annual production

2,100 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Mojstrana

Small Hydroelectric Power Plant (sHPP) Mojstrana

Start of operation: 1989
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant on the Triglavska Bistrica river. Two 400 kW units, installed flow of 3.0 m³/s, and a net head of 26.9 m.

2,700 MWh/year
average annual production

550 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Davča

Small Hydroelectric Power Plant (sHPP) Davča

Start of operation: 1987
Type of plant: Hydroelectric power plant

Preberite več

A low-pressure run-of-river derivation plant on the Davča torrent. A key feature is the buried steel pressure pipeline 600 mm in diameter and 656 m long.

800 MWh/year
average annual production

270 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Sorica

Small Hydroelectric Power Plant (sHPP) Sorica

Start of operation: 1989
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant on the Selška Sora (Sorica creek). A buried steel pressure pipeline 350 mm in diameter and 512 m long is characteristic, with ecological flow ensured through an opening in the concrete weir.

228 MWh/year
average annual production

128 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Soteska

Small Hydroelectric Power Plant (sHPP) Soteska

Start of operation: 1979
Reconstruction: 1998
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant on the Sava Bohinjka with two powerhouses (units). Operation requires an ecological flow of 1.1 m³/s through a permanently open bottom outlet of the weir.

4,200 MWh/year
average annual production

1,400 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Savica

Start of operation: 1949
Reconstruction: 2001
Type of plant: Hydroelectric power plant

Preberite več

The plant harnesses water below the Savica waterfall and has an exceptionally high head: 225.80 m gross / 219.80 m net. The site lies in environmentally sensitive areas of Triglav National Park and Natura 2000.

18 GWh/year
average annual production

4,265 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Škofja Loka

Start of operation: 1969
Reconstruction: 2003
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant on the Selška Sora with two turbines of different power.

1,247 MWh/year
average annual production

330 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Standard

Small Hydroelectric Power Plant (sHPP) Standard

Start of operation: 2024
Reconstruction: jez 1919
Type of plant: Hydroelectric power plant

Preberite več

A low-pressure run-of-river derivation plant on the Kokra with a short intake channel. The plant itself is new (2024), while the weir dates back to 1919.

1,340 MWh/year
average annual production

395 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Sava

Small Hydroelectric Power Plant (sHPP) Sava

Start of operation: 1924
Reconstruction: 1968, 1974
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river hydropower plant on the Sava in Kranj. Two units with different flows of 14 and 21 m³/s.

12,665 MWh/year
average annual production

1,697 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Zvirče

Small Hydroelectric Power Plant (sHPP) Zvirče

Start of operation: 2002
Type of plant: Hydroelectric power plant

Preberite več

A low-pressure run-of-river sHPP on the Tržiška Bistrica without water storage. The intake uses an existing gravel/concrete weir, while the derivation consists of a 300 m concrete pipeline to a surge tank and a 15 m steel pressure pipeline to the powerhouse.

1,300 MWh/year
average annual production

370 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Kokra

Small Hydroelectric Power Plant (sHPP) Kokra

Start of operation: 1898
Reconstruction: 1992
Type of plant: Hydroelectric power plant

Preberite več

A run-of-river derivation plant on the Kokra in Kranj. An older facility with a low head — main parameters: Qi 5.6 m³/s, gross head 8.6 m, net head 8.3 m.

1,800 MWh/year
average annual production

220 kW
installed capacity

Small Hydroelectric Power Plant (sHPP) Kranjska Gora

Small Hydroelectric Power Plant (sHPP) Kranjska Gora

Start of operation: 1915
Reconstruction: 1988
Type of plant: Hydroelectric power plant

Preberite več

A low-pressure run-of-river derivation plant on the Pišnica. The system consists of a buried pipeline to the sand trap, a supply channel to the surge tank, and a short pressure pipeline to the powerhouse.

546 MWh/year
average annual production

140 kW
installed capacity